Caso de Éxito

Structural Deficiencies in the Extension of a Winery in Alt Penedès

Case Summary

Location
Alt Penedès Region (Barcelona)
Type of Property
Industrial Winery
Problem Detected
Deficient execution of pavements and structural anchors
Result
Immediate correction order to guarantee the building's safety
Categories:
Structural Pathologies Industrial Warehouses
Albert Vilardell | Civil Engineer & Expert Witness
Publicado:
Detail of the defective anchoring of a metal beam in the winery

Fixing bolt extracted without traces of mortar or resin, demonstrating the absence of anchoring.

1. The Problem: Critical Defects after an Extension

The owner of a major winery in the Alt Penedès wine region commissioned us for a report after detecting serious anomalies in the extension works of their facilities. The defects compromised the functionality of the new pavements and, more worryingly, the structural safety of the new floor slab.

2. Technical Diagnosis: Three Areas of Serious Deficiencies

Our inspection and subsequent technical analysis, cross-referenced with the original execution project, revealed three critical problems that required immediate intervention:

  1. Unusable Terrace Pavement: The mortar of the new terrace had cracks of more than 1mm and surface disintegration due to deficient execution and the total absence of expansion joints. It was a useless support for the planned ceramic finish.
  2. Contaminated Ground Floor Pavement: The concrete on the lower floor was covered with grout residues, generating constant dust that prevented its use as a support for an industrial rolling pavement.
  3. Critical Structural Deficiency: This was the most serious finding. The main metallic beam supporting the new floor slab was not correctly anchored to the pillars according to the project. The intermediate supports, essential for structural calculation, were precariously fastened, compromising the stability and safety of the entire upper floor.

3. Solution and Conclusion

Our expert report was conclusive. It was demonstrated through calculations that the solution executed on the metallic structure did not guarantee the stability planned in the original project. An immediate correction of the anchoring system was ordered to ensure the integrity of the building.

Likewise, the complete demolition and reconstruction of the terrace pavement and the mechanical milling of the ground floor pavement were recommended. The report provided the owner with the necessary technical guidelines to demand a proper rectification of all deficiencies.

Do you have a similar case?

This case is an example of our experience in Structural Deficiency Reports . If you need a technical diagnosis in Barcelona, we can help you.